Ocean Place Potholing
C Below ran into some square steel-reinforced concrete under asphalt during this trenching project in Seal Beach. The purpose of the multiple trenches was to
C Below ran into some square steel-reinforced concrete under asphalt during this trenching project in Seal Beach. The purpose of the multiple trenches was to
US 101 HOV & Rehabilitation Project Client: Mark Thomas & CompanyDate: August 2016 Mark Thomas & Company hired C Below to perform an extensive Utility
Client: Penco EngineeringDate: September 2016Launch Project C Below was hired by Penco Engineering to map out almost the entire 4,770LF Grant High School campus in
Client: Koury Engineering & TestingDate: June 2017 C Below worked at Cypress High School to complete a utility investigation for the designated area. Included in
Client: Port of San Diego | Hale EngineeringDate: April- June 2017 Over the course of about three months, C Below completed a massive investigation of
Client: Harris & Associates, Port of Long BeachDate: June 2013 – October 2013 C Below was part of the design team for Harris & Associates